Designing of any products, aggregates, units and machines in refrigeration engineering as in any other machine-building industry, consists of the following stages:
- Technical specifications (initial technical data may be drawn up instead of technical specifications).
- Technical proposal.
- Sketch design.
- Technical design.
- Working design documentation (Working design).
At the end of the article there are links for other articles, in which the detailed contents for each stage of designing are given, as well as the articles that have specific examples of refrigeration equipment designing can be found.
The design documentation is an ultimate goal and product of design process. Products, systems, units, aggregates, etc will be manufactured upon this documentation in future.
The preview of each stage of designing is given below.
Stages of designing of design documentation
Technical proposal
Materials selection.
Technical proposal development.
Consideration and approval of technical proposal.
Sketch design
Sketch design development with documents lettering “E”.
Models producing and testing (if necessary).
Consideration and approval of sketch design.
Technical design
Technical design development with documents lettering “Т”.
Models producing and testing (if necessary).
Consideration and approval of technical design.
Working design documentation:
a) of a prototype (pilot batch) of the product intended for serial (mass) or one-off production (except for single manufacturing)
Development of design documentation meant for manufacturing and testing of the prototype (pilot batch) without lettering.
Manufacturing and preliminary testing of a prototype (pilot batch).
Correction of design documentation according to the results of remanufacturing and preliminary testing of a prototype (pilot batch) with documents lettering “О”.
Acceptance tests of the prototype (pilot batch).
Correction of design documentation according to the results of acceptance tests of the prototype (pilot batch) with documents lettering “О1”.
For the product designed as per the Defense Ministry order, if necessary, – remanufacturing and testing of the prototype (pilot batch) according to the documentation with letter “О1” and correction of design documents with lettering “О2”.
b) of serial (mass) production
Manufacturing and testing of consistency batch according to the documentation with letter “О1” (or “О2”).
Correction of design documentation according to the results of manufacturing and testing of consistency batch, as well as the equipment of technological process for product manufacturing with design documents lettering “А”.
For the product designed as per the Defense Ministry order, if necessary, – manufacturing and testing of initial (inspection) batch according to the documentation with letter “А” and respective correction of documents with lettering “B”.
Technical specifications (hereafter referred as TS or technical specifications) are the basis for designing the refrigeration equipment (refrigeration machine, condensing unit, condenserless unit, compressor and receiver unit), cooling chambers of conditioning, ventilation and heating system and equipment from any other machine-building industries. The technical specifications are agreed between two or more Parties –Customer, Developer (Designer), organization that carries out the mounting works (if not Designer) and other subcontractors (for example, the organization that carries out commissioning works).
List of materials for more detailed familiarization with stages of designing:
1. Technical specifications and initial technical data
This article contains:
- contents of technical specifications sections;
- example of drawing up the initial technical data for designing the chiller with condenser water cooling;
- example of drawing up the initial technical data for designing, calculation and selection of refrigeration unit for products cooling in chamber.
This article contains:
- general provisions of technical proposal;
- requirements to execution of technical proposal documents;
- list of works performed during the development of technical proposal.
This article contains:
- general provisions of sketch design;
- requirements to execution of sketch design documents;
- list of works performed during the development of sketch design.
Note: the article “Refrigeration unit for storeroom compartments based on water-cooled condensing unit” may be considered as main data for drawing up the sketch design being executed with the aim of making principal decisions for production of refrigeration storeroom and condensing unit ККА-24-V and also as the data giving a general idea about the principle of operation and arrangement.
This article contains:
- general provisions of technical design;
- requirements to execution of technical design documents;
- list of works performed during the development of technical design.
5. Condensing unit ККА-24-V. Technical design
This article contains the theses from explanatory notes and the examples of design documents developed within the framework of technical design of water-cooled condensing unit ККА-24-V.
6. Condensing unit ККА-24-V. Working design
This article contains the theses from explanatory notes and the examples of design documents developed within the framework of working design of water-cooled condensing unit ККА-24-V.